LIST OF FIGURES
|
|||
Figure No. |
Title |
|
|
Project Site Plan |
|
|
|
General Layout Plan (Sheet 1 of 2) |
|
|
|
General Layout Plan (Sheet 2 of 2) |
|
|
|
Locations of Water Quality Sensitive Receivers
(Sheet 1 of 3) |
|
|
|
Locations of Water Quality Sensitive Receivers
(Sheet 2 of 3) |
|
|
|
Locations of Water Quality Sensitive Receivers
(Sheet 3 of 3) |
|
|
|
Locations of Existing Stormwater Outfalls |
|
|
|
Sediment Loss Rate for Dredging and Sand Filling
Activities – Unmitigated Scenario for SCL |
|
|
|
Coastline Configuration |
|
|
|
Locations of Important Coral Community |
|
|
|
Sediment Sampling Station for Elutriate Testing
(Sheet 1 of 2) |
|
|
|
Sediment Sampling Station for Elutriate Testing
(Sheet 2 of 2) |
|
|
|
|
Locations of Representative Noise Sensitive
Receivers |
|
|
|
Locations of Representative Noise Sensitive
Receivers |
|
|
|
Locations of Representative Air Sensitive Receivers |
|
|
|
Contours of Cumulative Maximum 1-Hour TSP
Concentration in µg/m3 at 1.5m above Ground Level (Mitigated
Scenario 1) |
|
|
|
Contours of Cumulative Maximum 1-Hour TSP
Concentration in µg/m3 at 1.5m above Ground Level (Mitigated
Scenario 2) |
|
|
|
Contours of Cumulative Maximum 24-Hour TSP
Concentration in µg/m3 at 1.5m above Ground Level (Mitigated
Scenario 1) |
|
|
|
Contours of Cumulative Maximum 24-Hour TSP
Concentration in µg/m3 at 1.5m above Ground Level (Mitigated
Scenario 2) |
|
|
|
Contours of Cumulative Annual TSP Concentration in
µg/m3 at 1.5m above Ground Level (Mitigated Scenario 1) |
|
|
|
Contours of Cumulative Annual TSP Concentration in
µg/m3 at 1.5m above Ground Level (Mitigated Scenario 2) |
|
|
|
As-Built Sediment Sampling Locations (Sheet 1 of 2) |
|
|
|
As-Built Sediment Sampling Locations (Sheet 1 of 2) |
|
|
LIST OF APPENDICES
Appendix No. |
Title |
Graphic Illustrations of Alignment Options |
|
Temporary Reclamation Staging for SCL
Construction |
|
Tentative Construction Programme |
|
Layout and Extent of Marine Piling for Construction of the Temporary
Jetty |
|
Temporary Reclamation Stages at CBTS |
|
Coverage, Layout and Grid Quality of Refined VH Model |
|
Sediment Plume Modelling Results – Dry Season |
|
Sediment Plume Modelling Results – Wet Season |
|
Maximum Mixing Zone for SS Elevations (Contributed from this Project
and other Concurrent Marine Works) |
|
Maximum Mixing Zone for SS Elevations (Contributed from this Project
alone) |
|
Tracer Modelling Results for Zinc, total PCBs and total PAHs |
|
Typical configuration of silt curtains and silt screens |
|
Construction
Plant Inventory for SCL Protection Work – Unmitigated Scenario |
|
Appendix 4.2 |
Not Used |
Location
of Notional Sources and Distance to NSRs |
|
Sample
Calculation of Construction Noise Levels – Unmitigated Scenario |
|
Summary of
Predicted Construction Noise Levels – Unmitigated Scenario |
|
Construction
Plant Inventory for SCL Protection Work – Mitigated Scenario |
|
Sample
Calculation of Construction Noise Levels – Mitigated Scenario |
|
Summary of
Predicted Construction Noise Levels – Mitigated Scenario |
|
Cumulative
Construction Noise Assessment – Mitigated Scenario |
|
Past
Environmental Monitoring Data |
|
Calculations
of Emission Rates for SCL Protection Works |
|
Justification
for the percentage of Annual Average Active Area |
|
Calculations
of Emission Rates for Wan Chai Development Phase II and Central-Wan Chai
Bypass |
|
LIST OF APPENDICES (Cont’d) |
|
|
|
Appendix No. |
Title |
Breakdown
of C&D Material by Year |
|
Response
from EPD for Waste Disposal to Landfill |
|
Sediment
Sampling and Testing Plan |
|
Testing
Result and Disposal Classification |
|
Results of
Biological Screening |
|
Dredging
Rationale Approval |
|
Response
Letter from Highway Department and Minutes from Liaison Meetings with Other
Projects for Reusing C&D Materials |
|
Key Assessment
Assumptions and Methodologies |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|