LIST OF FIGURES                                                                                                                                                                      

Figure No.

Title

 

 

NEX2213/C/331/ENS/M50/501

Project Site Plan

 

 

NEX2213/C/331/ENS/M50/502

General Layout Plan (Sheet 1 of 2)

 

 

NEX2213/C/331/ENS/M50/503

General Layout Plan (Sheet 2 of 2)

 

 

NEX2213/C/331/ENS/M59/501

Locations of Water Quality Sensitive Receivers (Sheet 1 of 3)

 

 

NEX2213/C/331/ENS/M59/502

Locations of Water Quality Sensitive Receivers (Sheet 2 of 3)

 

 

NEX2213/C/331/ENS/M59/503

Locations of Water Quality Sensitive Receivers (Sheet 3 of 3)

 

 

NEX2213/C/331/ENS/M59/504

Locations of Existing Stormwater Outfalls

 

 

NEX2213/C/331/ENS/M59/505

Sediment Loss Rate for Dredging and Sand Filling Activities – Unmitigated Scenario for SCL

 

 

NEX2213/C/331/ENS/M59/506

Coastline Configuration

 

 

NEX2213/C/331/ENS/M59/507

Locations of Important Coral Community

 

 

NEX2213/C/331/ENS/M59/508

Sediment Sampling Station for Elutriate Testing (Sheet 1 of 2)

 

 

NEX2213/C/331/ENS/M59/509

Sediment Sampling Station for Elutriate Testing (Sheet 2 of 2)

 

 

NEX2213/C/331/ENS/M52/501

 

Locations of Representative Noise Sensitive Receivers

 

 

NEX2213/C/331/ENS/M52/502

 

Locations of Representative Noise Sensitive Receivers

 

 

NEX2213/C/331/ENS/M60/501

 

Locations of Representative Air Sensitive Receivers

 

 

NEX2213/C/331/ENS/M60/502

 

Contours of Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated Scenario 1)

 

 

NEX2213/C/331/ENS/M60/503

 

Contours of Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated Scenario 2)

 

 

NEX2213/C/331/ENS/M60/504

 

Contours of Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated Scenario 1)

 

 

NEX2213/C/331/ENS/M60/505

 

Contours of Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated Scenario 2)

 

 

NEX2213/C/331/ENS/M60/506

 

Contours of Cumulative Annual TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated Scenario 1)

 

 

NEX2213/C/331/ENS/M60/507

 

Contours of Cumulative Annual TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated Scenario 2)

 

 

NEX2213/C/331/ENS/M58/501

 

As-Built Sediment Sampling Locations (Sheet 1 of 2)

 

 

NEX2213/C/331/ENS/M58/502

 

As-Built Sediment Sampling Locations (Sheet 1 of 2)

 

 

 


 LIST OF APPENDICES

 

Appendix No.

Title

Appendix 2.1

Graphic Illustrations of Alignment Options

Appendix 2.2

Temporary Reclamation Staging for SCL Construction

Appendix 2.3

Tentative Construction Programme

Appendix 3.1

Layout and Extent of Marine Piling for Construction of the Temporary Jetty

Appendix 3.2

Temporary Reclamation Stages at CBTS

Appendix 3.3

Coverage, Layout and Grid Quality of Refined VH Model

Appendix 3.4

Sediment Plume Modelling Results – Dry Season

Appendix 3.5

Sediment Plume Modelling Results – Wet Season

Appendix 3.6

Maximum Mixing Zone for SS Elevations (Contributed from this Project and other Concurrent Marine Works)

Appendix 3.7

Maximum Mixing Zone for SS Elevations (Contributed from this Project alone)

Appendix 3.8

Tracer Modelling Results for Zinc, total PCBs and total PAHs

Appendix 3.9

Typical configuration of silt curtains and silt screens

Appendix 4.1

Construction Plant Inventory for SCL Protection Work – Unmitigated Scenario

Appendix 4.2

Not Used

Appendix 4.3

Location of Notional Sources and Distance to NSRs

Appendix 4.4

Sample Calculation of Construction Noise Levels – Unmitigated Scenario

Appendix 4.5

Summary of Predicted Construction Noise Levels – Unmitigated Scenario

Appendix 4.6

Construction Plant Inventory for SCL Protection Work – Mitigated Scenario

Appendix 4.7

Sample Calculation of Construction Noise Levels – Mitigated Scenario

Appendix 4.8

Summary of Predicted Construction Noise Levels – Mitigated Scenario

Appendix 4.9

Cumulative Construction Noise Assessment – Mitigated Scenario 

Appendix 5.1

Past Environmental Monitoring Data

Appendix 5.2

Calculations of Emission Rates for SCL Protection Works

Appendix 5.3

Justification for the percentage of Annual Average Active Area

Appendix 5.4

Calculations of Emission Rates for Wan Chai Development Phase II and Central-Wan Chai Bypass


 

LIST OF APPENDICES (Cont’d)

 

 

Appendix No.

Title

Appendix 6.1

Breakdown of C&D Material by Year

Appendix 6.2

Response from EPD for Waste Disposal to Landfill

Appendix 6.3

Sediment Sampling and Testing Plan

Appendix 6.4

Testing Result and Disposal Classification

Appendix 6.5

Results of Biological Screening

Appendix 6.6

Dredging Rationale Approval

Appendix 6.7

Response Letter from Highway Department and Minutes from Liaison Meetings with Other Projects for Reusing C&D Materials

Appendix 9.1

Key Assessment Assumptions and Methodologies